The sofa is due on Tuesday, the wardrobe in several packages on Wednesday, and the assembly team is expected on Friday. The apartment owner cannot be there for every delivery. Simply giving the contractor the address does not solve the problem: someone has to accept the delivery, check that it is complete and respond if the order does not match what arrives.
How do you organize deliveries to an apartment that is being finished? First, assign specific tasks to specific people, then bring orders, dates and reports together in one simple register. Being present for a delivery does not automatically mean checking the entire piece of furniture or taking over communication with the seller. These tasks need to be agreed separately.
One person coordinates, but does not have to do everything
Appoint someone who knows the delivery schedule and makes sure that each delivery has a designated recipient. This could be the owner or another person who has agreed to take on that scope of work. The coordinator should know who has access to the apartment, who will cover for the recipient when they are unavailable, and who to contact if a delivery date changes.
Keep coordination separate from accepting packages, unpacking, assembly and handling claims. If a contractor agrees only to let the courier into the apartment, do not assume they will compare the contents with the order. Also establish whether the recipient can make decisions about changing a delivery date or can only pass the information on to the owner. This division of responsibilities does not require a complex system; a clear agreement, written down and available to everyone involved, is enough.
Record orders so they can be checked
Prepare a shared register before the first delivery. Do not enter only “wardrobe for the bedroom”; include the product name, the variant identifier and the number of packages, if the seller provides it. Distinguish between an order arriving in one delivery and a delivery that has been deliberately split. Otherwise, an expected second shipment can easily be mistaken for a missing item.
For each item, record:
- the seller, order number and expected products;
- the delivery date, recipient and substitute;
- where the packages will be placed and who will check their contents;
- the status of any missing items, who is handling the report and the next step.
Attach the order confirmation or share it with the person checking the delivery. Do not share the entire purchase history if information about just one shipment is needed. When choosing furnishings, it is worth linking purchases in advance to the agreed interior design, so the recipient knows which model and variant were actually ordered.
Accepting packages and checking their contents are two separate steps
At delivery, the recipient should compare the number of packages received with the available documentation and note any visible damage. A photo of a crushed corner of the box along with the product label can help establish what the problem concerns later. However, a photo of all the packages lined up against a wall does not confirm that they contain all the parts.
So schedule a separate time to check the contents. The person checking should use the parts list for the specific product and record what has been checked and what still needs to be checked during assembly. Do not describe an unopened wardrobe as “complete”. A better note would be: “all packages stated as delivered have been received; contents to be checked”. Confirm the delivery scope and whether carrying items inside is included in the order, rather than treating it as an obvious responsibility of the recipient.
Decide where packages will be kept and who is responsible for them
An apartment being finished is both a work site and a temporary storage space for furnishings. Before transport, designate an area for the packages so they do not obstruct further work or access to rooms. Choose storage conditions and package placement in line with the manufacturer's instructions, not according to where there happens to be a spare metre of floor space.
Establish who may move the packages and who will record that they have been moved to another room or out of the apartment. If you plan to store them elsewhere, agree on the location, access, cost and responsibility for that stage. Do not assign these duties to the contractor or future rental operator just because they are involved in preparing the apartment. Keep the labels that link each package to its order, and retain packaging related to a reported problem until the next steps have been clarified.
One person should handle each missing-item report, and the issue does not disappear when a message is sent
Anyone who notices a missing or damaged item should provide specific information: which product, which part, which order it relates to and at what stage the problem was discovered. The designated person then contacts the seller through the appropriate channel. This could be the owner or someone acting within an agreed scope of work, but not an anonymous “someone from the team”.
Check the procedure with the relevant seller. For example, IKEA says that a missing product can be reported through purchase history or the order management tool.1 For damage, it lists the order number, a description and photos of the product, as well as photos of the packaging if it was damaged too.2 These are instructions from a specific seller, not a universal procedure for all deliveries.
Record the report confirmation, the response and the agreed next step in the register. “Claim submitted” does not mean the furnishings are ready. Close the matter only after the missing part has arrived and been checked, or another agreed solution has been reached.
The assembly plan should account for anything that has not yet been checked
Suppose, hypothetically, that a table and four chairs have been ordered for an apartment. All the boxes arrive, but when they are unpacked, it turns out that a part for one chair is missing. If the schedule says only “delivery received”, the person preparing the apartment may mistakenly assume the dining area is ready.
So distinguish between the statuses “delivered”, “checked” and “ready to use”. Before scheduling assembly, confirm that the necessary parts are available, and if something is missing, establish which work can continue. The guide from keys to rental explains the broader sequence for preparing an apartment. The delivery register should support this process, not replace checking that the entire apartment is ready.
Agree on the scope of assistance before the first delivery
If you want to entrust your apartment to GrandRent, also discuss what stage of preparation it is at. Rental management does not automatically include accepting all deliveries, storing furniture, assembly or handling claims. Any assistance with deliveries needs to be agreed separately: the tasks, availability, costs, authorizations and responsibilities. Start with the terms of cooperation.
We invite you to have a no-obligation conversation with GrandRent about a specific apartment in Trójmiasto. Prepare a list of orders and indicate which tasks you want to handle yourself and where you need support. The initial conversation about entrusting a property for rental management is free; the scope and costs of any additional services must be agreed individually.